## 1. Scope and screening

- Controller, Responsible Person, DPO, buildings and owner of assessment: [complete].
- Intended launch date, number of residents and expected review date: [complete].
- Screening: the workflow can reveal mobility, sensory or cognitive impairments. It concerns potentially vulnerable residents and can affect their safety and privacy. Record the high-risk screening outcome and reasons: [complete].
- Confirm which buildings fall under England’s Residential Evacuation Plans regulations and which features are enabled: [complete].

## 2. Processing and data flows

Residents or authorised representatives provide emergency-readiness details. Building management controls access and records evacuation-related choices and, where enabled, agreed assessments and statements. Review links may be sent by email or SMS. If applicable, the Responsible Person shares only the prescribed summary with the Fire and Rescue Service after verifying explicit informed consent. Printed or downloaded copies are outside application controls.

Record the source, collection notice, field list, frequency, approximate volumes, staff and supplier access, recipients, data-flow diagram and retention for each system: [complete].

## 3. Necessity and proportionality

- Record the Article 6 lawful basis and separate Article 9 condition for each purpose; consider any applicable Data Protection Act 2018 requirements: [complete].
- Explain why a less intrusive alternative would not work. Record assistance needs rather than diagnoses unless additional detail is necessary and justified: [complete].
- Keep routine roster participation and Fire and Rescue sharing choices distinct. Explain optional participation and withdrawal, verify representative authority, and provide an accessible offline route.
- Set role permissions, review intervals, correction/deletion procedures, and a process to replace previously shared copies.
- Record transfers and applicable safeguards. The primary EvacRoster database is in AWS US East (Ohio); do not assume UK-only or EU-only processing.

## 4. Consultation

Record how you sought the views of residents, representatives, staff, your DPO and the local Fire and Rescue Service. Describe accessibility support, feedback, changes made, and reasons if consultation was not appropriate: [complete].

## 5. Risks, measures and residual risk

For each row record likelihood, severity, control owner, implementation evidence, target date and residual risk. Example controls must be verified for your deployment.

| Risk to residents | Starting mitigation | Owner, evidence and residual risk |
| --- | --- | --- |
| Disclosure of health information | Minimise fields, restrict access, confirm encryption, review permissions | [complete] |
| Sharing without consent or after withdrawal | Verify current consent, restrict the export, replace copies held outside EvacRoster | [complete] |
| Stale or incorrect evacuation needs | Provide an accessible correction path; review on schedule and after changes; escalate non-responses | [complete] |
| Unavailable roster during an incident | Maintain and test a controlled offline procedure; date copies and replace old versions | [complete] |
| Unauthorised access through reminder links or shared devices | Use expiring, single-use links where available; keep message text generic; test the fallback | [complete] |
| International transfers and recovery copies | Verify provider destinations, safeguards, backup expiry and deletion after restore | [complete] |

## 6. Decision and ongoing review

- Final controls, testing and sign-off evidence: [complete].
- DPO advice and response to that advice: [complete].
- Remaining high risks: [complete]. If high risk cannot be mitigated, consult the ICO before proceeding.
- Controller approval, date, decision and review owner: [complete].
- Review after material changes to scope, providers, hosting, sharing, vulnerabilities or incidents; next scheduled check: [complete].

Reference: https://ico.org.uk/for-organisations/uk-gdpr-guidance-and-resources/accountability-and-governance/data-protection-impact-assessments-dpias/